Challenge

New outdoor locker room buildings are located on Central and North Campus, the building(s) construction provided a challenge due to both structures being built at the same time.  RL Turner Construction acted as the General Contractor for both High School projects. Comfort Systems USA Indiana was the HVAC contractor for both projects. 

Solution

The CSUSA Indiana Team:

·         Worked closely with RL Turner project manager and site Field Superintendents to man both projects at the same time so that RL Turner was able to keep their construction schedule for school board. HVAC systems were designed around Daikin VRF systems (variable refrigerant flow) with conditioned fresh air for building envelope.

·         Delivered the project on time and on budget.  2nd Rough for project started @ Thanksgiving 2016 and schools moved into their new buildings in time for Spring Track season of 2017.

·         Completed the project with zero safety incidents

A Closer Look

Locker room buildings offer office space for fall and spring coaches for both High Schools and locker rooms for their student athletes. Additional rooms include training and laundry facility for athletic teams.